Contact
  • Home
  • Oil field surface facility
    • Separator Skid
    • Metering Skid
    • Crude Oil Desalter/Dehydration
    • Heating Skid
  • LNG
    • Cryogenic Liquid Lorry Tanker
    • L-CNG High Pressure Pump
    • LCNG Refueling Station
    • LNG Gasification Station
    • LNG Loading Arm Skid
    • LNG Storage Tank
    • LNG Vaporizer
    • LNG Vehicle Cylinder
    • LNG Vehicle Dispenser
    • LNG Vehicle Fueling Skid
  • Gas processing
    • CNG Compressor
    • CNG Cylinder System for Car
    • CNG Decompression Skid
    • Compressed Natural Gas Dryers
    • CNG In A Box
    • CNG Trailer
    • CNG Vehicle Dispenser
    • Gas Sweetening
    • LPG Recovery
    • Molecular Sieve Dehydration
    • Triethylene Glycol Dehydration Units
  • Pipeline
    • Pig Launcher/ Receiver
    • Valve Station
    • Booster Station
    • Heating Skid
    • Odorizing Skid
    • Measurement Calibration Skid
    • Decompression Skid
  • Utility
    • Flare
    • Instrument Air & Nitrogen Generator
    • Chiller
    • Gas Engine
    • Thermal Heater System
    • MCC
    • Demineralized Water System
    • Control System
  • Industry
    • CO2 Recovery
  • Home
  • Gas processing
  • CNG Decompression Skid

Gas processing

  • CNG Compressor
  • CNG Cylinder System for Car
  • CNG Decompression Skid
  • Compressed Natural Gas Dryers
  • CNG In A Box
  • CNG Trailer
  • CNG Vehicle Dispenser
  • Gas Sweetening
  • LPG Recovery
  • Molecular Sieve Dehydration
  • Triethylene Glycol Dehydration Units
Home

CNG Decompression Skid

OGF has decades of supply and service experience in CNG Decompression Skid.

Contact Sales

Basic parameters

  • User type:  Industrial or Civil

  • Gas delivery pressure: 0.2-0.4MPa

  • CNG decompression sleds flow:500~8000 Nm³/h

  • Gas outlet temperature: ≥5℃

Performance

1)Design pressure:

  • Before level 1 pressure regulating: 25.0 MPa

  • After level 1 pressure regulating: 1.5 MPa

  • After level 2 pressure regulating: 0.6 MPa

2)Operating pressure

  • Inlet pressure: 20.0 MPa

  • After level 1 pressure regulating: 0.8-0.8 MPa

  • After level 2 pressure regulating: 0.2-0.6 MPa

3)Safety protection

Equipment safety protection chain including automatic cutting and automatic overpressure tossing, stepped double protection.

Automatic cut off the chain

Control system to control the chain line, chain control points are as follows:

  • Gas outlet temperature of regulator station over low temperature limit

  • Gas pressure after level 1 pressure regulating overpressure.

  • Gas pressure after level 2 pressure regulating overpressure.

  • Gas leakage alarm

When the above chain point to appear in any one or more, the way the entrance to the emergency cut-off valve shut automatically, Closed to protect downstream overall equipment.

Ultrahigh pressure loss on its own

Safety relief pipe valve are set on the pipeline after per level pressure regulating, when the pressure over the set value after the level 1 pressure regulating, the primary release valve automatically opens release; when the pressure over the set value after the level 2 pressure regulating, the secondary release valve automatically opens release.


  • Code: ASME, EN, GOST, CSA and so on.

  • Certificate: ASME U stamp /NB stamp, PED Certificate, Gost Certificate, CRN Certificate

  • Origin: China

  • Key instruments: International first-class brand

  • Delivery time: 3~5 months

  • OGF have provided products to Canada, USA, UK, Peru, Australia, Malaysia, Indonesia,  Japan, Korea, Iraq, Egypt, Nigeria and China etc


Copyright © OGF 2020. All Rights Reserved.

Cookie notice Privacy